Winter work



Another significant difference between us and the compitition, we work all year. True we have some pretty cold temperatures and that alone prevents the use of just about all other products.
Here are a few shots of a project in Logan UT. These are from the period just before Christmas to the end of January. The first building was done with no protective covering on it, rain casued the use of the tarps, but that was needed for the stucco crew. The decks are done before the stucco guys get started so plastic was used to to cover them to protect from water before installation.




The pictures don't really tell the whole story. On the days that I took these pictures it was below zero F. Yet the decks were being done and the contractor was ahead of schedule, not a common practice in the dead of winter with these kind of temps.